- Ports
- 1
- Maximum power (kW)
- 19.2
- Price
- Free
- Connectors
- J1772 (1 port)
Help charging here
How to chargeReport a problem
On the map
The chargers
Charger 1
- J1772, 19.2 kW, 4 m cable
Where the grid’s electricity comes from
Ontario: electricity generated in August 2026
- Nuclear43.3%
- Fuel-burning and other plants30.8%
- Hydro19.4%
- Wind3.8%
- Solar1.6%
- Biomass1.1%
- Carbon intensity of the grid
- 50.4 g CO₂e per kWh
- Adapted from Statistics Canada, Table 25-10-0015-01 Electric power generation, monthly generation by type of electricity, August 2026. This does not constitute an endorsement by Statistics Canada of this product. View the source
- Carbon intensity from the Clean Fuel Regulations (SOR/2022-140), Schedule 6, Default Carbon Intensity, 2026, converted from grams per megajoule to grams per kilowatt-hour. View the source
Is this your business? Put our map badge on your website
Copy this code into your website. It shows the badge and links to this page.
